NC State University - Centennial Campus

Central Utility Plant
Phase 2

  • img-central-utility-plant-phase-2-01

  • img-central-utility-plant-phase-2-02

Location:

Raleigh, NC

Delivery Method

Bid

Size

Addition 6,500 SF

Architect

Affiliated Engineers, Inc.

New Atlantic originally performed Phase 1 that included new chillers, distribution pumping, and cooling towers and was the successful bidder on this phase to expand the boiler wing.

Work consisted of installing a new 2,000 ton chiller, 9,000 gpm cooling tower with concrete basin, 38,000 gallon No. 6 fuel oil tank farm, and 80,000 lb/phr water tube boiler.